PRECISION BORE UNDER DOWNTOWN INTERSECTION

When a major telecom provider needed to run fiber under a high-traffic downtown intersection, they turned to AMDDS for a solution that avoided disruption and met a tight deadline.

16 Apr 2025

Precision Bore Under Downtown Intersection

When a major telecom provider needed to run fiber under a high-traffic downtown intersection, they turned to AMDDS for a solution that avoided disruption and met a tight deadline.

Strategic Planning

Our team performed detailed utility locating and coordinated with city engineers to design a bore path beneath existing infrastructure, ensuring safety and compliance with municipal requirements.

Flawless Execution

Using directional drilling, we installed over 400 feet of conduit beneath active lanes without disturbing traffic flow. Crews worked in controlled shifts to meet the schedule and minimize public impact.Ground Cover Champions

Rather than fighting weeds, let plants like creeping thyme or vinca minor take over the job. These low-growing plants spread naturally to fill gaps, keeping weeds at bay and soil moist, all while adding texture and visual interest.

On-Time Completion

The project was completed ahead of schedule, with zero safety incidents and full client satisfaction. The new fiber line is now powering faster connectivity for local businesses.

Final Takeaway

For projects in congested urban areas, AMDDS delivers precision, safety, and speed—ensuring critical infrastructure is in place without slowing the city down.